A move of more than 11.2 km outside of a major change filing window would require a contour study showing that the 60 dBu protected contour of the current facility overlaps the 60 dBu protected contour of the proposed facility, even if the overlap is slight.
Waivers are no longer given.
Please contact REC for assistance.
LPFM enhancements and change applications